Haratag
REV A · 2026Request a pilot
First-piece verification · at the machine

The green tag
you can query.

A magnet-mounted e-ink tag that tells every operator, supervisor and auditor whether this machine is cleared to run — and keeps the record that proves it.

0 wiresmagnet · no permits monthson one battery 1 tapbadge sign-off 8clauses covered
M-1000-04287%
RUN
5089-1121 rev D · OP 20
Inspector J. Alvarez · 07:42
Valid → 2026-09-16 · gauges in cal
LIVE · CYCLES EVERY 4 s
DISPLAY3.6″ 6-colour e-ink
MOUNT4 × magnets
POWERBattery, months
RATINGIP54 · shop floor
01

The green card is still paper.

Set-up verification is required by every automotive and aerospace quality standard. The evidence lives in a binder.

Today

  1. Inspector signs a paper card.Initials, date, part number. It goes in a sleeve on the machine, or a binder in the office.
  2. The machine sits idle over a weekend.Nobody knows exactly when. Monday's first part runs on Friday's approval.
  3. The gauge went out of cal on the 1st.The sticker says so. Nobody at the machine read it.
  4. The auditor asks for the record.Forty minutes of searching. One finding.

On Haratag

  1. Inspector taps a badge.The tag turns green with the part, revision, operation, inspector and expiry on the screen.
  2. The tag notices the idle.Built-in motion sensing. Past the threshold it turns yellow until someone re-verifies.
  3. Out-of-cal gauge blocks the sign-off.Tap the gauge on the tag. Red until the gauge is replaced.
  4. The record already exists.Every state change is in a tamper-evident log. Export it. Done.
02

Three colours. No ambiguity.

Readable from across the aisle. Unchanged by a power cut. Explained by a tap.

M-1000-04287%
RUN
5089-1121 rev D · OP 20
Inspector J. Alvarez 07:42
Valid → 2026-09-16
Green — verifiedFirst piece passed, gauges in cal, operator certified. Production may run.
M-1000-04286%
HOLD
Idle 62 h — verify after shutdown
IATF 8.5.1.4
Press ▲ to request QA
Yellow — needs a humanTool change, new part on the routing tag, new document revision, assigned gauge due, idle too long, or QA queued.
M-1000-04286%
STOP
Gauge CAL-0421 out of calibration
since 2026-08-01
Cannot sign first piece
Red — do not runReject, expired approval, wrong part scanned in, out-of-cal gauge at sign-off, or uncertified operator without override.
03

Magnet it to the machine. That is the install.

No wiring, no electrician, no work order. Wi-Fi from the plant network or a supplied router.

Stick it on

Four magnets hold it to any steel surface. Tags ship pre-registered to the plant.

Load the job

Part, revision, operation and control plan arrive from the plant dashboard. The tag turns yellow: awaiting first piece.

Tap to sign off

Inspector's badge on the tag records the first-piece approval. Out-of-cal gauge or uncertified operator? It refuses.

Green, with a record

The tag shows who, what, when and until-when. The plant dashboard and audit export see the same thing.

04

One tag, every “at the machine” clause.

What the standards ask for at the point of use, and what the tag does about it.

ClauseRequirementOn Haratag
IATF 8.5.1.3 · ISO 9001 8.6Verification of job set-ups; first-off / last-off; release recordsFirst-piece record turns the tag green with an expiry; “job complete” prompts last-off
IATF 8.5.1.4Verification after shutdownMotion sensing detects idle past the threshold; yellow until re-verified; restarts without sign-off are logged
ISO 9001 7.1.5 · IATF 7.1.5.1.1Calibrated measuring equipment at point of useTap the gauge on the tag: in or out of cal; out-of-cal blocks sign-off; gauges due listed per machine
IATF 8.5.1.1 · 8.5.6Current control plan and work instruction at the machineTag shows the CP and WI revision; a new release turns it yellow until the operator acknowledges
IATF 7.2.1 · 7.2.3Operator competence for the operationBadge tap: certified or not; supervisor override is recorded
IATF 8.5.1.5Total productive maintenance“PM due in 4 d” on the display; overdue turns it yellow
CQI-8 · customer-specificLayered process audits“LPA due today”; a supervisor badge tap completes it, timestamped
AS9100 · ISO 13485Environmental conditions for inspectionTemperature and humidity logged per machine on every wake

Nothing on the tag an auditor could object to.

Haratag is designed for shops with defense and export-controlled work. The tag holds no drawings, no controlled data, no customer names — only the state of the machine and the identity of the record.

  • NO CUI
    No controlled data leaves the server.The tag displays a status and a record ID. The record stays in your environment.
  • SIGNED
    Signed firmware, secure boot.Every update is signed; the tag refuses anything else.
  • PER-TAG
    One certificate per tag.Mutual TLS to the plant service. A lost tag is revoked, not reprogrammed.
  • LEDGER
    Tamper-evident record.Every state change is chained. Edit one and the chain says so.
  • ENCLAVE
    Cloud, GovCloud or on-prem.Deployment options for ITAR data-residency and US-person support.
05

Start with one line.

5 tags$4,950 · thirty operational days

Agree the machines, installation, training and success measures before the pilot starts. Measure first-piece recording, approval delays and record retrieval on your floor, then review whether to roll out.

  • Pilot fee credited once toward rollout onboarding
  • $49 per equipped machine / month; unlimited operators
  • $10,000 standard onboarding: one plant, up to 25 machines, customer-prepared data and a supported import path
  • Complex work $20,000–25,000 or separately quoted; travel and custom work scoped separately
  • 25-machine rollout minimum; 12-month initial term; annual prepayment preferred without automatic discount
  • 3% annual renewal escalator; special deployments separately scoped
  • Tags remain ours; failures replaced free
  • Operational days start after agreed installation acceptance
[ TURNSTILE · human check ]
We reply within one business day. No newsletter, no drip sequence.